Step-by-Step Furniture Production & Export Timeline
From deposit confirmation to vessel departure at Semarang Port, Art Classic (teak-wicker.com) follows a transparent 6-stage production and export workflow with regular photo and video updates sent directly to your inbox.
## From Factory Floor to Your Destination Port
| Stage |
Timeline |
Factory & Export Milestone |
| Stage 1: Timber Prep & Kiln-Drying |
Week 1 |
SVLK-certified Grade-A teak planks are selected and verified at 8%–12% moisture content. |
| Stage 2: Milling & Frame Joinery |
Week 2 |
Precision CNC/manual milling and traditional mortise-and-tenon frame assembly. |
| Stage 3: Hand-Weaving & Sanding |
Weeks 3–4 |
Artisanal HDPE wicker/rope weaving and progressive multi-grit hand sanding. |
| Stage 4: Finishing & Pre-Shipment QC |
Week 5 |
Eco-sealer/stain application, hardware fitting, and full photo/video QC report sent to client. |
| Stage 5: Export Packing & Stuffing |
Week 6 |
Foam/cardboard wrapping, SKU labeling, ISPM-15 fumigation, and container loading at Semarang Port. |
| Stage 6: Document & Telex Release |
Post-Sailing |
Delivery of Commercial Invoice, Packing List, SVLK V-Legal, COO, and Bill of Lading (B/L). |